Showing posts with label trim. Show all posts
Showing posts with label trim. Show all posts

Monday, April 18, 2011

Treads, Trim, Faucets and Fridge


Trying to catch up on some recent progress. Piper and I installed trim on the exterior windows after painting a lime wash on the walls. It gives the facade a nice finished look and rounds out the exterior color pallet.

A accidental blunder was made beautiful with the stair treads this week. The black stain on the treads was applied too thick and allowed to without removing the excess. In an attempt to fix the problem with the orbital sander, I found myself loving the look of a distressed finish oak board. The result is a great worn patina, with the oak coming through and I can't wait to see them installed with contrasting white kicks.

Soon the sink will be installed in the kitchen and with the excitement has come the stress of trying to figure out a faucet for a 4.5 foot wide sink. Our solution is to use two faucets, side by side. I had found a pair of matching faucets several years ago at a yard sale in North Carolina. One of the earliest items we collected, the two retail at over $200 and I got them for a steal at $10 a pop.

Wednesday, February 16, 2011

A Random Smattering of Progress


Holy crap it's starting to look like a real house! Almost all the painting is done, all the trim is cut, painted and nearly installed, we have lights, a ceiling fan and even a railing! It's amazing to look back and think that just a few months ago we still had straw sticking out everywhere.

As the finishing process continues, we're starting the mega task of cleaning up the space. So much sawdust, mud and drywall dust linger everywhere and I'm finding it hard to believe it will ever get clean!

The bedrooms are days away from being completely finished and the bathrooms are also well on there way. Piper and I started grinding down the outside of our claw foot tub with a wire wheel to get ready for painting. The cast iron beauty was given to us by our good friends Ron & Jill and I can't wait to get it installed.

The bottom photo shows a preview of a built-in unit in the 2nd floor bathroom which conceals a laundry shoot and linen closet. We used the leftover redwood flooring for the facade and the door will have a lengthwise mirror on the front.

The twin sets of french doors which separate the living room from the rest of the house were installed after a fresh coat of paint and new hinges, and now sport painted trim. I can barely keep up with all the progress that's been happening - but here's to trying to keep up with photography!

Sunday, January 23, 2011

Cutting, Sanding, Painting, Oh My!



Much finishing is underway. Freezing temperature and sunny days, cutting trim, sanding trim, priming trim, painting trim. Drywall is nearly complete after which a massive cleaning session will ensue. We have the illusion of a bathroom sink - it's exact installation method yet to be decided. A tile floor in the upstairs bath, though a little wonky, will keep our tootsies warm with thermostat controlled radiant heat coils. The shower stall is tiled and looks incredible. Both bathrooms are the furthest along of all the spaces and hopefully soon a toilet will be installed. More updates to come soon I hope!